Obsolete Toshiba PLC Replaced with Modern Siemens Controller for Industrial Oven

Sector:

General Manufacturing

Type:

Obsolecence Upgrade, Software

Platform: 

Siemens

Certification: 

CE / UKCA

Summary 

DelaControl replaced an end-of-life Toshiba PLC controlling an industrial electric oven with a modern Siemens S7-series controller, including a full software rewrite and on-site commissioning support.

Challenge

A Toshiba PLC controlling an electric oven on a production line had  reached the end of its serviceable life. The hardware was no longer  available to purchase, no manufacturer support existed, and no original  documentation for the system could be located.

The programming  environment required to interrogate or modify the existing Toshiba  controller was also unavailable, meaning the only reference material for  the control logic was a ladder diagram provided in PDF form.

Solution

DelaControl selected a Siemens S7-series PLC as the  replacement platform — a current, actively supported product with no  near-term obsolescence risk. The existing ladder logic, supplied as a  PDF, was used as the basis for a complete software rewrite in Siemens  TIA Portal, developed in line with DelaControl's in-house software  design standards to ensure the result is maintainable and clearly  structured.

Pre-delivery testing was carried out at DelaControl's  Bristol facility using I/O simulation equipment to validate correct  operation before the rack was shipped. A commissioning engineer attended  site to remove the old Toshiba rack, install the new Siemens  controller, and remain with the system to confirm satisfactory oven  operation.

Key Facts

• Replacement platform: Siemens S7-series PLC
• I/O modules supplied: 5 × DI 16-channel (230 VAC), 1 × DQ 32-channel (24 VDC), 4 × DQ 8-channel relay (230 VAC/5A)
• 1 × ET 200MP IM 155-5 PN BA interface module included
• Full control logic rewrite in Siemens TIA Portal from ladder diagram source
• Pre-delivery I/O simulation testing carried out at DelaControl facility
• On-site commissioning: 1 engineer, up to 3 days